Chapter Identifying and Developing Prerequisites for Takt Planning in a BIM-Based Construction Process

The construction industry is undergoing a significant shift in how design and production are conducted. Building Information Modeling (BIM) has emerged as a key tool for coordinating information from all involved disciplines and providing a more holistic view of the construction process. However, ef...

Täydet tiedot

Tallennettuna:
Bibliografiset tiedot
Päätekijät: Ljung, Efraim, Viklund Tallgren, Mikael, Roupé, Mattias, Johansson, Mikael
Aineistotyyppi: Online
Kieli:englanti
Julkaistu: Firenze University Press 2024
Aiheet:
Linkit:ONIX_20240402_9791221502893_45
Tagit: Lisää tagi
Ei tageja, Lisää ensimmäinen tagi!
_version_ 1869517880110874624
author Ljung, Efraim
Viklund Tallgren, Mikael
Roupé, Mattias
Johansson, Mikael
author_browse Johansson, Mikael
Ljung, Efraim
Roupé, Mattias
Viklund Tallgren, Mikael
author_facet Ljung, Efraim
Viklund Tallgren, Mikael
Roupé, Mattias
Johansson, Mikael
author_sort Ljung, Efraim
collection Directory of Open Access Books
description The construction industry is undergoing a significant shift in how design and production are conducted. Building Information Modeling (BIM) has emerged as a key tool for coordinating information from all involved disciplines and providing a more holistic view of the construction process. However, effective coordination and communication between different professions remain major challenges that require new approaches to project management. Takt planning has gained increasing attention as a potential solution to improve traditional planning methods. Despite this, there is a lack of real-world studies exploring BIM and takt planning where information is structured according to takt planning. A takt planning structure for all BIM-models would bring a more holistic understanding of what is to be done, controlled, and reported back. To address this gap, this paper presents findings from a three-stage research process. Firstly, form a focus group of disciplines to find a shared structure to present the execution in a common way for design and construction in a lab environment at a conceptual level, secondly implementing it to the detailed design information for real -world case project in workshops and group meetings with the focus group and then thirdly, evaluate it in the case project with the site staff involved. The findings highlight the importance of a shared denominator to get a holistic approach to project management and enabling takt planning throughout all phases of construction, providing insights into its practical application and benefits for the construction industry
format Online
id doab-20.500.12854ir-137249
institution Directory of Open Access Books
language eng
publishDate 2024
publishDateRange 2024
publishDateSort 2024
publisher Firenze University Press
publisherStr Firenze University Press
record_format ojs
spelling doab-20.500.12854ir-1372492024-05-13T04:57:17Z Chapter Identifying and Developing Prerequisites for Takt Planning in a BIM-Based Construction Process Ljung, Efraim Viklund Tallgren, Mikael Roupé, Mattias Johansson, Mikael WBS Building information modeling (BIM) Project Management Takt planning thema EDItEUR::U Computing and Information Technology::UT Computer networking and communications::UTV Virtualization The construction industry is undergoing a significant shift in how design and production are conducted. Building Information Modeling (BIM) has emerged as a key tool for coordinating information from all involved disciplines and providing a more holistic view of the construction process. However, effective coordination and communication between different professions remain major challenges that require new approaches to project management. Takt planning has gained increasing attention as a potential solution to improve traditional planning methods. Despite this, there is a lack of real-world studies exploring BIM and takt planning where information is structured according to takt planning. A takt planning structure for all BIM-models would bring a more holistic understanding of what is to be done, controlled, and reported back. To address this gap, this paper presents findings from a three-stage research process. Firstly, form a focus group of disciplines to find a shared structure to present the execution in a common way for design and construction in a lab environment at a conceptual level, secondly implementing it to the detailed design information for real -world case project in workshops and group meetings with the focus group and then thirdly, evaluate it in the case project with the site staff involved. The findings highlight the importance of a shared denominator to get a holistic approach to project management and enabling takt planning throughout all phases of construction, providing insights into its practical application and benefits for the construction industry 2024-05-13T04:57:14Z 2024-05-13T04:57:14Z 2024-04-02T15:45:47Z 2023 chapter ONIX_20240402_9791221502893_45 2704-5846 https://library.oapen.org/handle/20.500.12657/89076 9791221502893 https://directory.doabooks.org/handle/20.500.12854/137249 eng Proceedings e report open access image/jpeg n/a https://library.oapen.org/bitstream/20.500.12657/89076/1/9791221502893_56.pdf Firenze University Press 10.36253/979-12-215-0289-3.56 10.36253/979-12-215-0289-3.56 2ec4474d-93b1-4cfa-b313-9c6019b51b1a 9791221502893 11 Florence open access
spellingShingle WBS
Building information modeling (BIM)
Project Management
Takt planning
thema EDItEUR::U Computing and Information Technology::UT Computer networking and communications::UTV Virtualization
Ljung, Efraim
Viklund Tallgren, Mikael
Roupé, Mattias
Johansson, Mikael
Chapter Identifying and Developing Prerequisites for Takt Planning in a BIM-Based Construction Process
title Chapter Identifying and Developing Prerequisites for Takt Planning in a BIM-Based Construction Process
title_full Chapter Identifying and Developing Prerequisites for Takt Planning in a BIM-Based Construction Process
title_fullStr Chapter Identifying and Developing Prerequisites for Takt Planning in a BIM-Based Construction Process
title_full_unstemmed Chapter Identifying and Developing Prerequisites for Takt Planning in a BIM-Based Construction Process
title_short Chapter Identifying and Developing Prerequisites for Takt Planning in a BIM-Based Construction Process
title_sort chapter identifying and developing prerequisites for takt planning in a bim based construction process
topic WBS
Building information modeling (BIM)
Project Management
Takt planning
thema EDItEUR::U Computing and Information Technology::UT Computer networking and communications::UTV Virtualization
topic_facet WBS
Building information modeling (BIM)
Project Management
Takt planning
thema EDItEUR::U Computing and Information Technology::UT Computer networking and communications::UTV Virtualization
url ONIX_20240402_9791221502893_45
work_keys_str_mv AT ljungefraim chapteridentifyinganddevelopingprerequisitesfortaktplanninginabimbasedconstructionprocess
AT viklundtallgrenmikael chapteridentifyinganddevelopingprerequisitesfortaktplanninginabimbasedconstructionprocess
AT roupemattias chapteridentifyinganddevelopingprerequisitesfortaktplanninginabimbasedconstructionprocess
AT johanssonmikael chapteridentifyinganddevelopingprerequisitesfortaktplanninginabimbasedconstructionprocess